CONCRETE GRADE:
M5 = 1:5:10M7.5=1:4:8
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
M30 & above grade based on Design Mix
CLEAR COVER TO MAIN REINFORCEMENT:
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : 40 mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES : 20/30 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : 40 mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES : 20/30 mm
WEIGHT OF ROD PER METER LENGTH:
DIA WEIGHT PER METER; (Formula=D^2/162)
6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
UNITS:
1bag cement-50kg
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.ft
1cu.m-35.28cu.ft
1acre-43560sq.ft
1cent-435.6sq.ft
1hectare-2.47acre
1acre-100cent-4046.724sq.m
1ground-2400sq.ft
1unit-100cu.ft-2.83cu.m
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.ft
1cu.m-35.28cu.ft
1acre-43560sq.ft
1cent-435.6sq.ft
1hectare-2.47acre
1acre-100cent-4046.724sq.m
1ground-2400sq.ft
1unit-100cu.ft-2.83cu.m
1square-100sq.ft
1 M LENGTH STEEL ROD I ITS VOLUME
V=(Pi/4)*Dia x DiaX L=(3.14/4)x D x D X 1 (for
1m length) Density of Steel=7850 kg/ cub meter
Weight = Volume x Density=(3.14/4)x D x D X
1x7850 (if D is in mm ) So = ((3.14/4)x D x D X
1x7850)/(1000x1000) = Dodd/162.27
1m length) Density of Steel=7850 kg/ cub meter
Weight = Volume x Density=(3.14/4)x D x D X
1x7850 (if D is in mm ) So = ((3.14/4)x D x D X
1x7850)/(1000x1000) = Dodd/162.27
DESIGN MIX:
M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
12.5 mm Jelly : 455 Kg/ M 3
River sand : 794 Kg/ M 3
Total water : 176 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M 3
M25 ( 1 : 2.28 : 3.27)
Cement : 340 Kg/ M 3
20 mm Jelly : 667 Kg/ M 3
12.5 mm Jelly : 445 Kg/ M 3
River sand : 775 Kg/ M 3
Total water : 185 Kg/ M 3
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M 3
Note: sand 775 + 2% moisture, Water185 -20.5 =
164 Liters,
Admixture = 0.5% is 100ml
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture
(170.80+15.20)
M35 ( 1 : 1.79 : 2.57)
Cement : 410 Kg/ M 3
20 mm Jelly : 632 Kg/ M 3
12.5 mm Jelly : 421 Kg/ M 3
River sand : 735 Kg/ M 3
Total water : 200 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2400 Kg/ M 3
Note: sand = 735 + 2%, Water = 200- 14.7 =
185.30,
Admixture = 0.7%
M40 ( 1 : 1.67 : 2.39)
Cement : 430 Kg/ M 3
20 mm Jelly : 618 Kg/ M 3
12.5 mm Jelly : 412 Kg/ M 3
River sand : 718 Kg/ M 3
Water Cement ratio : 0.43
Admixture : 0.7%
Note: Sand = 718 + Bulk age 1%
M45 ( 1 : 1.58 : 2.26)
Cement : 450 Kg/ M 3
20 mm Jelly : 626 Kg/ M 3
12.5 mm Jelly : 417 Kg/ M 3
River sand : 727 Kg/ M 3 + Bulk age 1%
Water Cement ratio : 0.43
Admixture : 0.7%
M50 ( 1 : 1.44 : 2.23)
Cement : 450 Kg/ M 3
20 mm Jelly : 590 Kg/ M 3
12.5 mm Jelly : 483 Kg/ M 3
River sand : 689 Kg/ M 3 + Bulk age 12%
Water Cement ratio : 0.36 (188 Kg)
Admixture : 1.20%3
Micro silica : 30 Kg
Super flow 6.7% of cement
1 cubic meter contains 500 bricks?
The Standard size of the 1st class brick is 190mm
x 90mm x
90mm
and motor joint should be 10mm thick
So brick with motor=200 x 100 x 100.
Volume of 1st class brick = 0.19 x 0.09 X 0.09 = 0.001539 cu.m
Volume of 1st class brick with motor =0.2 x 0.1 x 0.1=0.002 cu.m
No. on bricks per 1cu.m= 1/volume of1st class brick with mortor
=1/0.002
= 500 no’s of bricks
So brick with motor=200 x 100 x 100.
Volume of 1st class brick = 0.19 x 0.09 X 0.09 = 0.001539 cu.m
Volume of 1st class brick with motor =0.2 x 0.1 x 0.1=0.002 cu.m
No. on bricks per 1cu.m= 1/volume of1st class brick with mortor
=1/0.002
= 500 no’s of bricks
STANDARD CONVERSION FACTORS
INCH = 25.4 MILLIMETRE
FOOT = 0.3048 METRE
YARD = 0.9144 METRE
MILE = 1.6093 KILOMETER
ACRE = 0.4047 HECTARE
POUND = 0.4536 KILOGRAM
DEGREE FARENHEIT X 5/9 – 32 = DEGREE CELSIUS
MILLIMETRE= 0.0394 INCH
METRE = 3.2808FOOT
METRE = 1.0936YARD
A rope having length 100cm.You can form any
shape using this rope (Example: Triangle,
Rectangle, etc.,). Which shape will covers
maximum area
1 Newton = o.101971 kg
1 mm2 = 0.01 cm2
1 cm2 = 100 mm2
1 mm2 = 20 N
100 mm2 = 2000N
1 cm2 = 2000N
2000 N = 203.942 kg
So 20 N/ mm2 = 203.942 kg / cm2
FOOT = 0.3048 METRE
YARD = 0.9144 METRE
MILE = 1.6093 KILOMETER
ACRE = 0.4047 HECTARE
POUND = 0.4536 KILOGRAM
DEGREE FARENHEIT X 5/9 – 32 = DEGREE CELSIUS
MILLIMETRE= 0.0394 INCH
METRE = 3.2808FOOT
METRE = 1.0936YARD
A rope having length 100cm.You can form any
shape using this rope (Example: Triangle,
Rectangle, etc.,). Which shape will covers
maximum area
1 Newton = o.101971 kg
1 mm2 = 0.01 cm2
1 cm2 = 100 mm2
1 mm2 = 20 N
100 mm2 = 2000N
1 cm2 = 2000N
2000 N = 203.942 kg
So 20 N/ mm2 = 203.942 kg / cm2
M20 Grade:RATIO IS 1:1.5:3
then volume is 1+1.5+3=5.5 and the total volume
for using mix=1.57 m3 then cement required=1/ 5.5*1.57
for using mix=1.57 m3 then cement required=1/ 5.5*1.57
=0.285m3*1440=411 kg. (8+bag)
sand requried=1.5/5.5*1.57=0.471m3
aggregate required=3/5.5*1.57=0.853m3
the standard volume of dry mix mortar=1.57..
sand requried=1.5/5.5*1.57=0.471m3
aggregate required=3/5.5*1.57=0.853m3
the standard volume of dry mix mortar=1.57..
U
can check it in IS code also.
Then volume is
1+1.5+3=5.5 and the total volume for using
mix=1.57 m3 then cement required =1/ 5.5*1.57
1+1.5+3=5.5 and the total volume for using
mix=1.57 m3 then cement required =1/ 5.5*1.57
=0.285m3*1440=411 kg.(8+bag)
sand requried=1.5/5.5*1.57=0.471m3
aggregate required=3/5.5*1.57=0.853m3
the standard volume of dry mix mortar=1.57..
sand requried=1.5/5.5*1.57=0.471m3
aggregate required=3/5.5*1.57=0.853m3
the standard volume of dry mix mortar=1.57..
U
can check it in IS code also.
MATERIAL CALCULATION:
CEMENT IN BAGS
01. PCC 1:5:10 1440/5*0.45 129.60Kg 2.59
02. PCC 1:4:8(M 7.5) 1440/4*0.45 162.00Kg 3.24
03. PCC 1:2:4(M 15) 1440/2*0.45 324.00Kg 6.48
04. PCC 1:3:6(M 10) 1440/3*0.45 216.00Kg 4.32
05. RCC 1:2:4(M 15) 144/2*0.45 324.00Kg 6.48
06. RCC 1:1.5:3(M 20) 1440/1.5*0.45 32.00Kg 8.64
07. RCC 1:1:2(M 25) 370.00Kg 7.40
08. RCC M 30 410.00Kg 8.20
09. RCC M35 445.00Kg 8.90
10. RCC M40 480.00Kg 9.60
11. Damp Proof Course
CM1:3,20mm tk 1440/3*0.022 10.56Kg 0.21
12. 2"tk precast slab M15 324*0.05 16.20Kg 0.32
13. 3"tk precast slab M15 324*0.075 24.30Kg 0.49
14. GC Masonry CM 1:7 1440/7*0.34 70.00Kg 1.40
15. Brick Work CM 1:6 1440/6*0.25 60.00Kg 1.20
16. Brick Work CM 1:4, 115tk 1440/4*0.25*0.115 10.35Kg 0.21
17. Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.05 21.60Kg 0.43
18. Plastering CM 1:3, 12mm tk 1440/3*0.014 6.72Kg 0.13
19. Wall Plastering CM 1:4,
12mm tk 1440/4*0.014 5.00Kg 0.10
20. Laying Pressed Tiles Over
a CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
21. Ceramic Tiles, Marble,
Granite, Caddapah Slab
CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
22. Hollow Block Masonry
CM 1:6, 200mm tk/m¬2¬ 10.00Kg 0.20
02. PCC 1:4:8(M 7.5) 1440/4*0.45 162.00Kg 3.24
03. PCC 1:2:4(M 15) 1440/2*0.45 324.00Kg 6.48
04. PCC 1:3:6(M 10) 1440/3*0.45 216.00Kg 4.32
05. RCC 1:2:4(M 15) 144/2*0.45 324.00Kg 6.48
06. RCC 1:1.5:3(M 20) 1440/1.5*0.45 32.00Kg 8.64
07. RCC 1:1:2(M 25) 370.00Kg 7.40
08. RCC M 30 410.00Kg 8.20
09. RCC M35 445.00Kg 8.90
10. RCC M40 480.00Kg 9.60
11. Damp Proof Course
CM1:3,20mm tk 1440/3*0.022 10.56Kg 0.21
12. 2"tk precast slab M15 324*0.05 16.20Kg 0.32
13. 3"tk precast slab M15 324*0.075 24.30Kg 0.49
14. GC Masonry CM 1:7 1440/7*0.34 70.00Kg 1.40
15. Brick Work CM 1:6 1440/6*0.25 60.00Kg 1.20
16. Brick Work CM 1:4, 115tk 1440/4*0.25*0.115 10.35Kg 0.21
17. Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.05 21.60Kg 0.43
18. Plastering CM 1:3, 12mm tk 1440/3*0.014 6.72Kg 0.13
19. Wall Plastering CM 1:4,
12mm tk 1440/4*0.014 5.00Kg 0.10
20. Laying Pressed Tiles Over
a CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
21. Ceramic Tiles, Marble,
Granite, Caddapah Slab
CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
22. Hollow Block Masonry
CM 1:6, 200mm tk/m¬2¬ 10.00Kg 0.20
SAND CALCULATION (CFT):
01. Any Concrete Work
(PCC, RCC) 0.45*35.315= 20.00
02. Damp Proof Course
CM `1:3, 20mm tk 1.00
03. 2"tk Precast slab M15 1.00
04. 3"tk Precast slab M15 1.50
05. SS Masonry in CM 1:7 15.00
06. Brick Work in CM 1:6 15.00
07. Brick Work in CM 1:4,115mm tk 2.00
08. Grano Flooring in CC 1:1.5:3 1.00
09. Plastering in CM 1:3, 12mm tk 1.00
10. Wall Plastering CM 1:4, 12mm tk 1.00
11. Laying Pressed Tiles over a CM 1:4, 20mm tk 1.00
12. Ceramic Tiles, Marble, Granite, Cuddapah slab
CM 1:4, 20mm tk 1.00
(PCC, RCC) 0.45*35.315= 20.00
02. Damp Proof Course
CM `1:3, 20mm tk 1.00
03. 2"tk Precast slab M15 1.00
04. 3"tk Precast slab M15 1.50
05. SS Masonry in CM 1:7 15.00
06. Brick Work in CM 1:6 15.00
07. Brick Work in CM 1:4,115mm tk 2.00
08. Grano Flooring in CC 1:1.5:3 1.00
09. Plastering in CM 1:3, 12mm tk 1.00
10. Wall Plastering CM 1:4, 12mm tk 1.00
11. Laying Pressed Tiles over a CM 1:4, 20mm tk 1.00
12. Ceramic Tiles, Marble, Granite, Cuddapah slab
CM 1:4, 20mm tk 1.00
METAL CALCULATION:
01. Any Concrete Work 32.00 cft
02. Grano Flooring in CC 1:1.5:3, 50mm tk 1.60 cft
03. Grano Flooring in CC 1:1.5:3, 75mm tk 2.40 cft
04. Grano Flooring in CC 1:1.5:3, 100mm tk 3.20 cft
05. Bricks/cum 450.00 Nos
06. Size Stone/ cum 90.00 Nos
07. Rough Stone 10.00 cft
08. Bond Stone/ cum 10.00 Nos
09. Cement Paint/100 Sft 2.00 Kg
10. White Cement/100 Sft 2.00 Kg
11. Janathacem/100 Sft 1.50 Kg
12. Enamel Paint/100 Sft - 2 Coats 1.25 Litre
13. Wall Putty/100 Sft 10.00 Kg
14. Plaster of Paris/100 Sft 25.00 Kg
15. Distember/100 Sft 2.00 Kg
16. Cement Primer 0.60 Litre
0.40 Litre
17. Weathering Course
Lime 12.50 Kg
Brick bats 32.00 Kg
18. Providing Sand Gravel Mix- Cum
Sand 20.00 Cft
Gravel 40.00 Cft
19.WBM - 75mm tk - 1st Layer - 10 Sqm
Metel(60-40 mm) 35.00 Cft
Gravel 10.00 Cft
20. Pressed Tiles - Sqm 20.00 Nos
21. Hollow Block - 200mm tk 14.00 Nos
02. Grano Flooring in CC 1:1.5:3, 50mm tk 1.60 cft
03. Grano Flooring in CC 1:1.5:3, 75mm tk 2.40 cft
04. Grano Flooring in CC 1:1.5:3, 100mm tk 3.20 cft
05. Bricks/cum 450.00 Nos
06. Size Stone/ cum 90.00 Nos
07. Rough Stone 10.00 cft
08. Bond Stone/ cum 10.00 Nos
09. Cement Paint/100 Sft 2.00 Kg
10. White Cement/100 Sft 2.00 Kg
11. Janathacem/100 Sft 1.50 Kg
12. Enamel Paint/100 Sft - 2 Coats 1.25 Litre
13. Wall Putty/100 Sft 10.00 Kg
14. Plaster of Paris/100 Sft 25.00 Kg
15. Distember/100 Sft 2.00 Kg
16. Cement Primer 0.60 Litre
0.40 Litre
17. Weathering Course
Lime 12.50 Kg
Brick bats 32.00 Kg
18. Providing Sand Gravel Mix- Cum
Sand 20.00 Cft
Gravel 40.00 Cft
19.WBM - 75mm tk - 1st Layer - 10 Sqm
Metel(60-40 mm) 35.00 Cft
Gravel 10.00 Cft
20. Pressed Tiles - Sqm 20.00 Nos
21. Hollow Block - 200mm tk 14.00 Nos
CONVERSION TABLE:
01. 1 RM 3.28 Rft
02. 1 Sqm 10.76 Sft
03. 1 Cum 35.32 Cft
04. 1 Inch 2.54 cm
05. 1 sft 0.09Sqm
06. 1 Acre 0.04 Hectare
07. 1 Hectare 2.47 Acres
08. 1 Cft 0.028 Cum
09. 1 Feet 12.00 Inch
10. 1 Feet 0.305 M
11. 1 Cum 1000.00 Litre
02. 1 Sqm 10.76 Sft
03. 1 Cum 35.32 Cft
04. 1 Inch 2.54 cm
05. 1 sft 0.09Sqm
06. 1 Acre 0.04 Hectare
07. 1 Hectare 2.47 Acres
08. 1 Cft 0.028 Cum
09. 1 Feet 12.00 Inch
10. 1 Feet 0.305 M
11. 1 Cum 1000.00 Litre
UNIT WEIGHT:
01. Concrete 25 kN/m3
02. Brick 19 kN/m3
03. Steel 7850 Kg/m3
04. Water 1000 Lt/m3
05. Cement 1440 Kg/m3
06. 1Gallon 4.81 Litres
07. Link 8" = 200mm
08. 1 Hectare 2.471 acr(10000m2)
09. 1 Acr 4046.82m2 = 100 cent
02. Brick 19 kN/m3
03. Steel 7850 Kg/m3
04. Water 1000 Lt/m3
05. Cement 1440 Kg/m3
06. 1Gallon 4.81 Litres
07. Link 8" = 200mm
08. 1 Hectare 2.471 acr(10000m2)
09. 1 Acr 4046.82m2 = 100 cent
DEVELOPMENT LENGTH:
01. Compression 38d
02. Tension 47 & 60d
03. 1 Cent 435.60 Sft
04. 1 Meter 3.2808 ft
05. 1 M2 10.76 ft2
06. 1 Feet 0.3048m
07. 1 KN 100Kg
08. 1kN 1000N
09. 1 Ton 1000Kg = 10,000 N = 10 kN
10. 1 kG 9.81N
M5=2.54Bg/m3, M7.5=3.18Bg/m3, M10=4.32Bg/ m3,
M20=8.64Bg/m3, M25=12.9 Bg/m3,
M40=500+100Kg/m3
1m3 Conrete = 0.9 m3 Jelly + 0.55 m3 Sand + 0.225 m3 cement
02. Tension 47 & 60d
03. 1 Cent 435.60 Sft
04. 1 Meter 3.2808 ft
05. 1 M2 10.76 ft2
06. 1 Feet 0.3048m
07. 1 KN 100Kg
08. 1kN 1000N
09. 1 Ton 1000Kg = 10,000 N = 10 kN
10. 1 kG 9.81N
M5=2.54Bg/m3, M7.5=3.18Bg/m3, M10=4.32Bg/ m3,
M20=8.64Bg/m3, M25=12.9 Bg/m3,
M40=500+100Kg/m3
1m3 Conrete = 0.9 m3 Jelly + 0.55 m3 Sand + 0.225 m3 cement
BRICK:
Weight = 3.17 - 3.80 Kg
Water absorption 12 to 15%
Compressive strength = 36Kn/cm2
230mm Wall/m3 = 460 Bricks + 20Cft Sand + 66Kg Cement
SSM 1:7/m3 = Slize 95 + Soiling 8 Cft +60.5 Kg
Current = 1000 Watts = 1 Unit, 25Watt*40Hr = 1Unit
Sunshade = 65mm - 0.56 bag/m2,
= 90mm - 0.78 bag/m2
Tiles, Kotta, Marble - 0.33,,,
Water absorption 12 to 15%
Compressive strength = 36Kn/cm2
230mm Wall/m3 = 460 Bricks + 20Cft Sand + 66Kg Cement
SSM 1:7/m3 = Slize 95 + Soiling 8 Cft +60.5 Kg
Current = 1000 Watts = 1 Unit, 25Watt*40Hr = 1Unit
Sunshade = 65mm - 0.56 bag/m2,
= 90mm - 0.78 bag/m2
Tiles, Kotta, Marble - 0.33,,,
Good Post. Your blog is very informative for us. I would really like to come back again right here for likewise good articles or blog posts. Thanks for sharing a nice information.
ReplyDeleteM Sand in Bangalore
Manufacture Sand for Plastering
tnkks
DeleteThanks for your information ,and very useful notes
ReplyDeleteThanks for your information ,and very useful notes
ReplyDeletetnks
DeleteM5 ratio is 1:5:10
ReplyDeleteM7.5 ratio is 1:4:8
For M5 ratio is 1:5:10
ReplyDeleteGreat deed.. thanks
ReplyDeleteso grateful
ReplyDeletevery nice sir.............thanks
ReplyDeleteThanks for such a wonderful blog. I appreciate your efforts to write this.
ReplyDeleteKeep Posting!! Best M Sand in Bangalore
Goof job sir
ReplyDeleteAnd very important for fresher civil engineering
Super notes sir
ReplyDeleteManufactured Sand with the granule thickness of 0 - 2.36 mm is suitable for all plastering purposes and is used across all segments such as Independent Houses, Apartments and other Residential & Commercial Projects. Plastering sand need not be filtered again at site hence it can be used directly to prepare the mortar which saves labour time and money.
ReplyDeleteManufacturing Sand for Plastering in Bangalore
धन्यवाद जी
ReplyDeleteIt's very important notes
ReplyDeleteAnd helpful to my work,
Thanks sit
It's very important thing , thank you for this
ReplyDeleteWhat is Design mix of M50
ReplyDeleteTnq for more information
ReplyDelete